Where is the production facility located?
The production facility is situated in Guangdong Province. This strategic location ensures efficient supply chain operations and timely delivery to global clients.
What are the supported delivery terms?
We support a range of international delivery terms including EXW (Ex Works), FOB (Free On Board), CFR (Cost and Freight), and CIF (Cost, Insurance, and Freight).
What is the typical delivery timeframe?
Orders are generally fulfilled within 15 to 20 working days after confirming the initial deposit. This includes manufacturing, quality inspection, and shipment preparation.
What are the standard payment terms?
The standard structure is a 30% advance deposit via T/T to initiate production, with the remaining 70% balance due before shipment.
How can I obtain a detailed system quotation?
Please provide details on: 1. System Type (Off-grid, Hybrid, etc.); 2. Daily energy consumption (kWh) and peak load (kW); 3. Required backup autonomy days; 4. Installation environment (Rooftop, ground, etc.); 5. Types of appliances to be powered.
Do high-startup loads affect system design?
Yes, high-startup or impact loads like pumps or compressors affect inverter sizing and overall system design, so it is important to specify these during the inquiry.